Skip to content

Project preparation

Clear inputs.
A better starting point.

Gather what you have, identify what is still unknown, and share the current version of your project. This guide helps you prepare for an engineering quote, a property scan, or a real estate walkthrough.

Download checklist (PDF)
2 pages · 80 KB · Opens in a new tab

Start with what you know

You do not need every answer to begin.

Use Unknown for unconfirmed specifications and leave unconfirmed number fields blank. SPE reviews the information and confirms the scope, fee, schedule, and any remaining inputs before engineering or capture work begins.

For residential HVAC engineering

Six groups of useful information.

Send current documents and confirmed details. For renovations, distinguish the existing conditions from the proposed work.

Review engineering services

01 · Project

Location & scope

  • Project address and contact person
  • New construction, full renovation, or another proposed scope
  • Conditioned floor area, floors, HVAC system count, and target schedule

Separate heated/cooled area from unconditioned garages, patios, or similar spaces.

02 · Documents

Current plans

  • Dimensioned floor plans and available elevations or sections
  • Window/door schedules and construction specifications
  • Latest revision date, north arrow, and any permit-office checklist

No usable plans? Review scanning options for an existing-layout starting point.

03 · Equipment

System preferences

  • Preferred manufacturer and proposed model numbers, if known
  • System type, fuel, equipment locations, and zoning goals
  • Existing equipment or ducts you intend to retain

Preferences guide coordination; final equipment selection is evaluated against the project requirements.

04 · Comfort

Design inputs

  • Desired indoor summer cooling and winter heating setpoints
  • Known ventilation or humidity requirements
  • Room use, occupancy, and unusual internal loads

Identify special rooms or conditions that the plans may not explain.

05 · Construction

Envelope details

  • Wall, roof/ceiling, and floor assemblies with insulation R-values
  • Window/door sizes and available U-factor/SHGC information
  • Roof material, orientation, attic, foundation, and adjacent spaces

Share specifications rather than guessing concealed construction or product performance.

06 · Coordination

Constraints & changes

  • Available duct routes, equipment clearances, and access constraints
  • Known changes to plans, materials, or equipment
  • Items needing confirmation and who can provide them

Tell SPE before relying on a design affected by a substitution or field change.

New construction: SPE requires Manual J + S + D; J + S alone is not offered. Every final engineering plan and calculation package SPE issues is signed and sealed by a licensed Professional Engineer for the authorized project jurisdiction. The permit authority determines approval.

For scanning & real estate walkthroughs

Prepare the purpose and the property.

Capture requirements depend on how you will use the record. Existing floor plans are not required.

Compare scanning services

Define the record

Identify whether you need a walkthrough for property marketing, existing-layout PDFs, or a scan coordinated with HVAC engineering. List the floors, interior spaces, and accessible exterior areas to capture, plus the intended use and schedule.

Arrange safe access

Obtain authorized access, secure pets, and identify restrictions or hazards. Clear important edges and circulation routes. For a property presentation, tidy or stage the rooms and remove personal information or items you do not want captured.

Confirm delivery

Agree the files, viewing platform, sharing format, and any hosting period or ongoing charges before booking. Tell SPE about travel, detached structures, extra visits, or additional deliverables. Scan records do not establish concealed construction or replace separately scoped engineering.

When you are ready

Send once. Review together.

Estimate

Use the live estimator to explore a preliminary, nonbinding budget for your selected service.

Submit

Use Project Intake for your details and available supporting documents. Mark unknowns for review.

Confirm

SPE reviews the information and provides the formal scope, fee, deliverables, and schedule for your approval.

Start the intake for your service.

Choose HVAC engineering for design work, including optional bundled scanning. Choose a standalone scan or walkthrough when no HVAC engineering is requested.