Design standards & professional oversight
Engineering grounded in recognized methods.
ACCA Manual J, S, and D methods connect residential heating and cooling loads, equipment selection, and duct design.
Design references
A consistent technical foundation.
These ACCA publications are design references. They are distinct from an individual’s professional license or training credentials.
Manual JResidential load calculations
Heating and cooling loads reflect the building’s construction, windows, orientation, location, and design conditions.
ACCA design references (opens in a new tab)
Manual SEquipment selection
Equipment is evaluated against calculated loads and project design conditions, using relevant performance information.
ACCA design references (opens in a new tab)
Manual DResidential duct design
Air distribution is developed around airflow requirements, available space, equipment, and duct-system design considerations.
ACCA design references (opens in a new tab)Licensed professional engineering
Plans signed and sealed by a licensed Professional Engineer.
Every final engineering calculation package and plan SPE issues is signed and sealed by a licensed Professional Engineer for the authorized project jurisdiction. Signing and sealing are included in both residential HVAC engineering packages.
- Project location and licensing coverage confirmed before engagement
- Design developed around supplied plans and verified project inputs
- Applicable project and jurisdiction requirements considered in the agreed scope
The authority having jurisdiction determines permit requirements and approval. PE signing and sealing is not a guarantee of permit approval.

In-house quality assurance
Engineering review before final issue.
SPE’s in-house HVAC QA application helps identify issues during engineering review, with the goal of reducing avoidable rework.
The application supports the licensed PE’s judgment.
- Start with clear inputsCurrent plans, construction details and project requirements.
- Check the engineeringIn-house quality assurance supports professional review.
- Issue the final documentsSigned and sealed engineering within the confirmed scope.

Equipment preferences
Tell us which equipment you want evaluated.
Share preferred manufacturers, model numbers, ductwork and component requirements, including brands not shown below. SPE evaluates selections against the project’s loads, design conditions, compatibility and available performance data.
Heating & cooling equipment
Examples of heating and cooling equipment manufacturers.
Air distribution & components
Examples across flexible ductwork, grilles, HVAC controls and refrigeration components.
Flexible ductwork
Grilles, registers & diffusers
HVAC components
HVAC controls
Logos identify their respective manufacturers. No affiliation, sponsorship, dealer status or endorsement is implied.
Start with the requirements that matter.
Share your project location, plans, and engineering needs for a clear scope review.


